House - Rating 4.7 (27)

Jungle House At Championsgate

As low as $159.00 / night + taxes & fees

  • Location: Davenport
  • Type: House
  • View: Downtown

Bedroom 7 bedrooms
Bathroom 5 baths
Guests 27 guests
Pets Not Allowed Pets Not Allowed

Summary Summary
Tucked inside the lush, amenity-rich ChampionsGate Resort, this home is more than just a place to stay—it’s an experience. As the name alludes, this 900-acre gated community is a destination in itself, where every day feels like a luxury getaway. And when you're ready for adventure beyond the gates, Orlando’s world-renowned theme parks are just a short drive away—though you might find it hard to leave this incredible community at all.
Description Description
With two clubhouses, including access to the brand-new Retreat Club and the popular Oasis Club, you’ll enjoy everything from poolside hammocks and waterslides, to a lively pool bar, kids’ splash areas, and even on-site dining and restaurant delivery. After settling into Jungle House At Championsgate, tee off on one of two Greg Norman-designed golf courses, relax in the European-style spa, float the 850-foot lazy river, or make a splash at the resort’s wave pool.

When you arrive, step through the door into your own jungle-chic paradise, where earthy textures, natural wood accents, and tropical decor create a warm and welcoming vibe. The open-concept living room features an oversized grey sectional, wrapped in rich wallpaper and custom jungle-themed artwork—perfect for movie nights on the smart TV with cable. The kitchen is sleek and modern, outfitted with white cabinetry, gray stone countertops, and a breakfast bar with seating for four. Just beyond, the dining area invites you to enjoy meals around a table for six, with large windows overlooking the pool, framed by vibrant decor and greenery.

Head upstairs to the loft, where a massive black sectional, smart and cable TV, oversized bean bag, and a built-in desk-for-two turn this into the ultimate movie-night-meets-workspace lounge. Don’t miss the game room, an Avatar-inspired hideaway with air hockey, a Pac-Man arcade machine, and its own smart TV. And outside, your private screened lanai is pure magic. A hot tub spills into the sparkling pool, and a shaded patio offers seating for 14—including 2 cozy swings, a grill, and a custom tiki bar where you can mix tropical drinks while the kids splash in the sun. Whether you're soaking in the spa or lounging under the stars, the vibe here is effortless luxury with a playful twist.

This home comfortably sleeps 27 guests in 7 private bedrooms and 2 twin size beds in the game room.

Bedroom #1 includes 2 sets of twin-over-twin bunk beds, a twin size trundle bed, and an ensuite bathroom, also accessible via the hallway, with a dual vanity and a walk-in shower.

Bedroom #2 includes 2 sets of twin-over-twin bunk beds, a queen size bed, and an ensuite bathroom, also accessible via the patio, with a dual vanity, a soaking tub, and a walk-in shower.

Bedroom #3 includes a king size bed, a smart TV, and an ensuite bathroom with a dual vanity and a walk-in shower.

Bedroom #4 includes 2 queen size beds, patio access, and a Jack-and-Jill bathroom with a dual vanity and a walk-in shower, shared with Bedroom #5.

Bedroom #5 includes a king size bed, a smart TV, and a Jack-and-Jill bathroom shared with Bedroom #4.

Bedroom #6 includes 2 twin size beds, a queen size bed, and a smart TV.

Bedroom #7 includes a queen size bed, a smart TV, and an ensuite bathroom, also accessible via the hallway, with a dual vanity and a shower/tub combo.

THINGS TO NOTE:
• Washer and dryer in home.
• Home does not have an ice maker or filtered water.
• Driveway and street parking for 5 vehicles available, parking pass required.
• 2 portable cribs and high chair available.
• Optional pool heat is available (recommended during the winter months), for $29 a night. 48-hour notice is needed to ensure the pool is properly heated, and if requested must be for the full duration of the stay.
• Grill rental optional, for an additional $95. 48-hour notice needed. Cost to rent a BBQ off site is $150/week and cannot be guaranteed.
• This home is equipped with one (1) external security camera located at the entryway and actively monitoring the front foyer exterior.
• All guests aged 18 and over must be registered in advance in order to access the Champions Gate community.

Vacationing in Davenport, Florida, offers a perfect blend of relaxation and adventure. Located just a short drive from Orlando’s world-famous theme parks like Walt Disney World and Universal Studios, Davenport provides a quieter, more laid-back atmosphere while keeping you close to all the action. Visitors can enjoy beautiful golf courses, scenic nature trails, and family-friendly attractions like the nearby LEGOLAND Florida Resort. Whether you're looking to explore Central Florida's top attractions or unwind in a peaceful setting, Davenport is a hidden gem worth discovering.

For all reservations made through our official website, guests will be required to complete a secure verification process through our third-party partner, Autohost. This process helps us ensure the safety and integrity of all stays. Our full privacy policy, which explains how your information is handled and protected, is available upon request prior to booking.

- This property is non-smoking. A $500 fine plus mitigation costs will apply for violations.
- Pets are not allowed. A $500 fine plus cleaning costs will apply if pets are brought to the property.
- Do not exceed the maximum number of allowed cars or occupants.
- Do not park vehicles in the grass - violators may be towed or ticketed.
- Quiet hours are 9:00 PM – 7:00 AM. Please be mindful, as there are neighbors nearby.
- Failure to follow these or any rules outlined in the rental agreement may result in fines, forfeiture of the security deposit, and, in some cases, early termination of the stay without a refund.

Availability Calendar Availability Calendar
Available
Unavailable
Check-In
Check-Out
June 2026
Su Mo Tu We Th Fr Sa
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30        
July 2026
Su Mo Tu We Th Fr Sa
      1 2 3 4
5 6 7 8 9 10 11
12 13 14 15 16 17 18
19 20 21 22 23 24 25
26 27 28 29 30 31  
August 2026
Su Mo Tu We Th Fr Sa
            1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31          
September 2026
Su Mo Tu We Th Fr Sa
    1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30      
October 2026
Su Mo Tu We Th Fr Sa
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
November 2026
Su Mo Tu We Th Fr Sa
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 24 25 26 27 28
29 30          
December 2026
Su Mo Tu We Th Fr Sa
    1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31    
January 2027
Su Mo Tu We Th Fr Sa
          1 2
3 4 5 6 7 8 9
10 11 12 13 14 15 16
17 18 19 20 21 22 23
24 25 26 27 28 29 30
31            
February 2027
Su Mo Tu We Th Fr Sa
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28            
March 2027
Su Mo Tu We Th Fr Sa
  1 2 3 4 5 6
7 8 9 10 11 12 13
14 15 16 17 18 19 20
21 22 23 24 25 26 27
28 29 30 31      
April 2027
Su Mo Tu We Th Fr Sa
        1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30  
May 2027
Su Mo Tu We Th Fr Sa
            1
2 3 4 5 6 7 8
9 10 11 12 13 14 15
16 17 18 19 20 21 22
23 24 25 26 27 28 29
30 31          
Swipe Swipe for Availability

Bedding Bedding
Twin Bed icon
5 SINGLE BEDS
Bunk Bed icon
4 BUNK BEDS
Queen Bed icon
5 QUEEN BEDS
King Bed icon
2 KING BEDS

Amenities 67 Amenities
  • Air conditioning
  • Baking sheet
  • Bathtub
  • BBQ grill
  • Bed linens
  • Blender
  • Board games
  • Body soap
  • Cable TV
  • Carbon monoxide detector
  • Clothing storage
  • Coffee maker
  • Communal pool
  • Conditioner
  • Cookware
  • Dining table
  • Dishes and silverware
  • Dishwasher
  • Downtown
  • Dryer
  • Essentials
  • Free parking on premises
  • Free parking on street
  • Freezer
  • Game room
  • Garden or backyard
  • Gym
  • Hair dryer
  • Hangers
  • Heating
  • High chair
  • Hot tub
  • Hot water
  • Internet
  • Iron
  • Kettle
  • Kitchen
  • Laptop friendly workspace
  • Laundromat nearby
  • Microwave
  • Outdoor pool
  • Outdoor seating (furniture)
  • Oven
  • Pack ’n Play/travel crib
  • Patio or balcony
  • Ping pong table
  • Private entrance
  • Private pool
  • Refrigerator
  • Resort
  • Resort access
  • Shampoo
  • Shopping
  • Smoke detector
  • Stair gates
  • Stove
  • Suitable for children (2-12 years)
  • Suitable for infants (under 2 years)
  • swimming pool
  • Theme Parks
  • Towels provided
  • TV
  • Village
  • Washer
  • Water Parks
  • Wine glasses
  • Wireless Internet

Location Location

Reviews Rating 4.7 (27) Reviews
Rating 5
Lots of space! Looks like the pictures. Def worth the money spent! Great response time even though we didn’t need to reach out to them for much. Would def book it again. 10/10
Anonymous - Posted: 5/16/2026
Rating 3
The furniture is in desperate need for new furniture. The furniture is wore out and sink holes on the sectional. The end table is broken and definitely out dated. Pots and pans need to be replaced like ASAP. The beds are slam down on the floor feels like I was sleeping on the floor and trying to get up from the bed is not easy. The beds are definitely cheap and definitely need a box spring to lift the beds up higher . Cheap beds they do not even have head board so you can’t sit in bed read or watch tv comfortably. The beds are children friendly because if an infant or toddler falls off they will not be hurt. But we are a tall family 5’8- 6’2 and these are by far the cheapest beds I have ever slept in and we vacations all the time. And I will tell my family about this house but I would not recommend this house for my family to come stay in on vacation. Needs renovation on appliances-furniture and BEDS ASAP. And consider a new house theme the pictures are creepy in the living room.
Anonymous - Posted: 5/15/2026
Rating 5
Excelente alojamiento, habitaciones muy lindas. Lo malo que había mucho calor y el aire acondicionado lo tenían programado para una temperatura de 73 grados. Hacía mucho calor porque éramos una familia grande. Pero la pasamos increíble la casa muy bonita.
Anonymous - Posted: 5/14/2026
Rating 5
10/10
Anonymous - Posted: 4/29/2026
Rating 5
Such a beautiful home! Very clean, communication was very easy and we had quick response on anything we needed!
Alejandra M. - Posted: 4/20/2026
Rating 4
The pool was in very poor condition, with visible hair, earrings, dirt, and trash in the water. It appeared stagnant and clearly needed to be cleaned or properly circulated. As it stands, it felt like a health concern. Because of this, I would not choose to stay at this property again. The stated that the heated feature of the pool was required to have the pump on to circulate and filter the water. If that is the case then it should really just be included in the rental rate so the pool is useable. The heated feature is an extra fee not included in the rental price. We personally didn’t want the water heated it wasn’t necessary for the time of year. Just keep that in mind if you are looking at this property. Overall stay was good but what’s the point of a pool that’s not useable.
Anonymous - Posted: 4/12/2026
Rating 5
We had a blast for the kids spring break! Champions gate will always be our 1st choice. Thank you for hosting my family!
Anonymous - Posted: 4/12/2026
Rating 5
We stayed here with three different families, each with small children. There is TONS of space. The place was absolutely spotless. There were enough towels and starter amenities. The hosts were very up front with every thing. Check out was simple. There wasn’t a long list of things to do like some air bnbs have. It’s in a peaceful area but also close to the parks and shopping/food. We would definitely stay again.
Anonymous - Posted: 3/7/2026
Rating 5
We had a wonderful stay at Jungle House! We were a group of 10 adults and 8 young children, and there was plenty of space for all of us throughout the house- in the common areas, bedrooms and kitchen! We particularly loved the house pool, hot tub and access to the resort pool. The house and patio area were clean. The kids had a blast picking out their rooms based on the themes. Be prepared to purchase cleaning supplies (dish soap, hand soap, paper goods, etc.) when you do your grocery run upon arrival.
Anonymous - Posted: 3/1/2026
Thank you, Alexis! We're thrilled you and your group enjoyed your stay at Jungle House and made wonderful memories. We appreciate your feedback and look forward to welcoming you back soon!
Grand Welcome staff
Posted: 3/8/2026
Rating 3
I had the best time at this Airbnb. The service was incredible. The host made sure all guests were comfortable and able to get in with no problems. I may have called the host at least 50 times, and there was never an attitude or disagreement. Every name on the list was organized, and everyone was welcomed with open arms. The rooms were fantastic, and the house was spotless from front to back, top to bottom. There was more than enough space for my family. I give this house a 10 out of 10.
Anonymous - Posted: 12/29/2025
Thank you, Willie, for your thoughtful review. We’re so happy to hear that you had a positive stay and that the home met your needs in terms of comfort, cleanliness, and space. We appreciate your feedback and are glad the overall experience was a good one. We would love to host you again in the future for another incredible stay!!
Grand Welcome staff
Posted: 1/3/2026
Rating 5
Great place.
Anonymous - Posted: 12/22/2025
Rating 4
Very spacious and great for little ones.
Anonymous - Posted: 12/15/2025
Rating 5
Nice amenities. We enjoyed our stay and had plenty of room! Thank you!!
Anonymous - Posted: 12/7/2025
Thank you, Michael! We;re thrilled to hear you enjoyed your stay and appreciated the amenities. Your feedback means a lot to us, and we can’t wait to welcome you back for another wonderful experience!
Grand Welcome staff
Posted: 12/14/2025
Rating 5
Enjoyed stay
Anonymous - Posted: 11/27/2025
Thank you, Oneil! We're thrilled to hear you enjoyed your stay. Your feedback means a lot to us, and we can’t wait to welcome you back for another wonderful experience!
Grand Welcome staff
Posted: 12/8/2025
Rating 5
Really nice place to stay,
Anonymous - Posted: 11/22/2025
Thank you, Vilma, for your kind feedback! We’re so glad you enjoyed your stay and hope to host you again soon!
Grand Welcome staff
Posted: 12/14/2025
Rating 5
Amazing place, beautiful home! Exactly as advertised in the pictures. The hosts were incredible and very responsive to any questions or concerns we had. Will definitely be booking with them again in the future.
Anonymous - Posted: 11/14/2025
Thank you so much, Arvin, for your wonderful feedback. We're delighted to hear that the home met your expectations and that our responsiveness helped make your stay even smoother. It means a great deal to know you'd choose to stay with us again, and we look forward to welcoming you back in the future.
Grand Welcome staff
Posted: 11/28/2025
Rating 5
Great place for our family! Love it!
Anonymous - Posted: 11/4/2025
Thank you, Nanette, for your kind words! We’re glad to hear your family enjoyed your stay and appreciated our space. We hope to welcome you back again anytime!
Grand Welcome staff
Posted: 11/24/2025
Rating 5
the home is beautiful ! i came for my daughters birthday so all the kids loved the jungle theme and the bunk beds. i was there for two nights and it was full rolls of toilet paper provided paper towles and garbage bags to start you off more then enough cups and plates the kitchen is well stocked with the basics everything was clean i have no complaints we didn’t want to leave. it’s a mile away from publix and chicfila papa john’s ect .
Anonymous - Posted: 10/29/2025
Rating 5
This home was exactly as pictured! The stunning images and creativity all throughout the home was great from the downstairs to the upstairs. Checking in was a breeze from the front gate to accessing the home, and the cleanliness of the home was spot on. All in all this home was 10/10 would definitely recommend and hope to stay again in the future.
Anonymous - Posted: 10/20/2025
Thank you so much, Dante, for your wonderful review! We're thrilled to hear the home matched your expectations, from the design to the cleanliness, and that check-in was smooth throughout. We're grateful for your recommendation and would be delighted to welcome you back in the future!
Grand Welcome staff
Posted: 11/9/2025
Rating 5
Very clean, accessible, spacious home. Hosts were able to answer all questions and made it an easy process, will definitely book again
Anonymous - Posted: 10/12/2025
Rating 5
The house is as the pictures show. We had an amazing time on the house. The host was very responsive and available. I recommend this home 100%.
Anonymous - Posted: 9/28/2025
Thank you for your kind words Carmen! We’re so glad the house met your expectations and that you had an amazing time. We appreciate your recommendation and would love to welcome you back anytime!
Grand Welcome staff
Posted: 10/13/2025
Rating 5
This was one of the best and clean Airbnb's that I've ever stayed at. My daughter was able to enjoy her Sweet 16 birthday. And I would like to thank the host for being responsive and making everything easy. This location and the place was EXCELLENT and if I could give it a 10 star, I most definitely would.
Anonymous - Posted: 9/17/2025
Rating 5
Place was beautiful and spacious for our annual cousins trip.
Anonymous - Posted: 9/11/2025
Thank you, Tansheba, for sharing your experience! We’re so glad the house was a beautiful and spacious fit for your annual cousins’ trip. We appreciate your insight and would love to welcome you back for the next trip!
Grand Welcome staff
Posted: 10/6/2025
Rating 5
The house is exactly as pictured, all 14 of us slept comfortably and had room for more if needed. It was very nice, loved the jungle theme!
Anonymous - Posted: 9/2/2025
Rating 5
It was worth the stay, so clean and loved how the theme was.
Anonymous - Posted: 8/16/2025
Thank you, Dalericka, for your kind words! We’re happy you enjoyed the cleanliness and theme of the home. We’d be delighted to welcome you back anytime!
Grand Welcome staff
Posted: 10/12/2025
Rating 5
👆
Anonymous - Posted: 8/14/2025
Rating 5
Beautiful place with great craftsmanship for the decorations!
Anonymous - Posted: 7/21/2025
Thank you for your kind words Chastain! We’re delighted you enjoyed the beauty of the place and appreciated the craftsmanship in the decorations. We’d love to welcome you back for another stay!
Grand Welcome staff
Posted: 8/10/2025
Swipe Swipe for More Reviews